Markets

Europe's most important company sold zero machines in Europe this year.

ASML put Europe at 0% of 2026 system sales — down from 5% in 2024. No leading-edge fabs are being built on the continent, and the €80bn Chips Act is on track for 11.7% of global output against a 20% target.

N Noah · The Sharp Brief · September 27, 2026 · 4 min read

The single most important company in the semiconductor supply chain sits in Veldhoven, in the Netherlands. So far in 2026 it has sold, in its own words, “absolutely nothing” on the continent it is built on.

Frank Heemskerk, ASML's executive vice president of public affairs, gave the number at De Balie in Amsterdam this week: Europe accounted for 0% of ASML system sales in 2026. The trend line behind it is not a blip. Europe was 5% in 2024, 4% in 2023, 2% in 2022, and 1% in 2025. The company that makes every advanced lithography machine on earth has a home market that has effectively stopped ordering.

The mechanical reason is narrow and decisive: no leading-edge fabs using EUV or High-NA EUV are being built in Europe. The plants that are being built, and the ones planned, run mature nodes — automotive, industrial, power. Those lines do not buy ASML's most advanced and most profitable tools. TSMC and Samsung have committed to High-NA by 2030. Neither will install it in Europe.

The Chips Act bought supply and forgot demand

The European Chips Act set a target of 20% of global semiconductor production by 2030 and mobilised roughly €80 billion toward it. The European Court of Auditors assessed the arithmetic last year and concluded the EU will reach about 11.7% — from a baseline near 9% — and recommended what it politely called a reality check. Hitting 20% would have required roughly quadrupling capacity.

Heemskerk's ask is notable because it is not a subsidy request. ASML is arguing that Europe has been funding fabs while doing nothing about demand, and that the missing piece is European chip buyers — the industrial and automotive giants — committing to source locally. He described the goal as harnessing Europe's market power rather than its cheque book, and said the conversation runs up to Commission President Ursula von der Leyen.

Our take: This is an industrial-policy post-mortem delivered by the beneficiary, which is what makes it credible. Europe spent five years and €80 billion subsidising the construction of capacity while never addressing the reason nobody wanted to build leading-edge capacity there: the customers are in Asia and the United States, the energy is expensive, and the AI demand cycle that pulled forward every EUV order on the planet routed around the continent entirely. ASML's own numbers are the cleanest available measure of the outcome — not a forecast, not a think-tank estimate, but shipment data from the sole supplier. Zero is unambiguous. For investors the read is that ASML's growth is now fully levered to US and Asian capex decisions with no domestic ballast; for anyone building industrial policy, the lesson is that supply-side subsidy without a demand commitment buys mature-node fabs and a press release.

What it changes

What to watch

Advertisement

Get the day, decoded — at 7 PM ET

The Sharp Brief: AI, money, business & performance in five sharp minutes. Free.

Free bonus: subscribe today and The 2026 Side-Hustle Playbook lands with your welcome email.

★ Recommended by 5+ newsletters across AI, markets & business.