Rates moved against you today. The Federal Reserve raised its target range to 3.75%–4% and the projections point at another increase before the year is out. If you run a business with a revolver, an equipment line, a floating-rate term loan or a renewal coming up in the next four quarters, that sentence has a number attached to it and you probably do not know what the number is.
Most operators handle a rate move the same way: nothing for a quarter, then a nasty surprise at renewal when the lender re-cuts the covenant package and the pricing grid moves two notches. The damage is rarely the interest itself. The damage is that the interest change was absorbed silently for nine months, and by the time anyone looked, the cash buffer that would have funded the fix had already been spent on it.
This is the ninety-minute version of looking. Do it once this week. Do it again the day the next hike lands.
Why this is a playbook and not a memo: nobody needs a view on monetary policy to run this. Every step below uses numbers you already have, produces a decision you can act on this month, and takes under two hours end to end. This is operational finance for your own balance sheet — it is not investment advice and nothing here is a recommendation about markets or securities.
Step 1 — The debt inventory (20 minutes)
Open a blank sheet. One row per facility. Seven columns, no more:
- Facility — revolver, term loan, equipment finance, card, merchant advance, lease.
- Balance drawn today, not the limit.
- Fixed or floating. If you cannot tell in thirty seconds, it is floating — go and check.
- Index + spread — SOFR + 275, prime + 1.5, and so on.
- Reset frequency — daily, monthly, quarterly. This is what decides when a hike actually reaches you.
- Maturity / renewal date.
- Covenants — the actual tests, with the actual thresholds.
Two things fall out of this immediately. The first is your floating share: drawn floating balance divided by total drawn. The second is your renewal cliff: how much debt has to be re-negotiated in the next twelve months. Those two percentages are the whole exposure, and almost nobody running a small or mid-sized business can recite either of them from memory.
Worked example
A distribution business, illustrative numbers. $2.4m drawn on a revolver at SOFR + 300, resetting monthly. $1.1m equipment term loan, fixed at 6.1%, four years left. $300k on cards at a rate nobody has looked at since 2023. Floating share: 63%. Renewal cliff: the revolver, in seven months.
A 25bp move costs that business roughly $6,000 a year on the revolver. That is not the problem. The problem is that the revolver renews in seven months into a pricing grid that has moved, held by a lender whose own credit committee just watched bank stocks fall 3% on hike day.
Step 2 — The covenant pre-mortem (25 minutes)
Take each covenant and run it forward on your current forecast, then run it again on a deliberately bad one. The bad case does not need to be sophisticated. Use three levers:
- Revenue 10% below plan.
- Gross margin 150bp below plan.
- Interest cost up another 50bp from here.
Apply all three at once. Yes, at once — the entire point of a pre-mortem is that shocks correlate. Cost inflation and rate increases arrive together precisely because they have the same cause, which is why a freight business absorbing a diesel spike is also the business whose fixed-charge coverage ratio is under pressure the same quarter.
Now write down, for each covenant, the month in which it breaks in the bad case. If nothing breaks, you have a strong balance sheet and this exercise took you forty-five minutes. Good. If something breaks in month nine, you have eight months to do something about it, which is the difference between a conversation and a default.
Step 3 — The price question (20 minutes)
There is exactly one arithmetic question that matters here: how much price covers this?
Take the annual increase in interest expense from Step 1 — both the hike that just happened and one more of the same size. Divide by revenue. That is your required price increase, expressed in percentage points, before any volume response.
For the distribution business above, with $12m of revenue: about $12,000 of additional annual interest across both moves, on $12m, is 0.1%. One tenth of one percent. That business does not have a rate problem; it has an attention problem, and the correct response is to stop worrying about the hike and go back to work.
Run the same calculation on a business with $9m of floating debt and $6m of revenue and you get roughly 0.4% — still small, but now stacked on top of whatever input costs are doing. Different answer, different conversation. The point of the arithmetic is that it tells you which of those two businesses you are before you spend a week worrying.
If the number comes back above roughly 1% of revenue, you are not running a pricing exercise, you are running a capital structure exercise, and Step 5 is the important one.
Step 4 — The buffer test (10 minutes)
Cash on hand, plus undrawn committed availability, divided by average monthly operating outflow. That is your runway in months, and it is the only number that determines how much optionality you have in a negotiation.
Under four months, you take whatever terms you are offered. Over nine months, you can walk. Between the two, you can negotiate but not bluff. Know which one you are before you pick up the phone, because your lender already does.
One trap: undrawn availability on a facility with a material adverse change clause is not a buffer. It is a buffer your counterparty can withdraw on the day you need it. Count it separately.
Step 5 — The lender conversation (30 minutes, once)
Call your relationship manager before you need anything. The single most valuable asset in a tightening cycle is a lender who thinks you are on top of your numbers, and that reputation is built in the quarter when you do not need a waiver.
A script that works, adapted to your facts:
“We ran our exposure this week after the Fed move. We are 63% floating, the revolver renews in March, and on our downside case — revenue down 10, margin down 150 basis points, another 50 basis points of rate — fixed-charge coverage gets to 1.3 times in month nine against a 1.25 test. We are not asking for anything today. I wanted you to have the same numbers we have, and to understand how you are thinking about the renewal grid so we can plan around it.”
Three things that sentence does. It demonstrates you have modelled a downside rather than hoping. It puts a specific month on the table so nothing is a surprise later. And it asks a question — about the grid — whose answer is genuinely useful and costs the lender nothing to give.
Do not open with a request for a covenant reset you do not yet need. You only get to spend that credibility once.
Step 6 — The renewal calendar
Put every maturity and renewal date from Step 1 into a shared calendar with a reminder 120 days before, not thirty. Refinancing options exist at four months out and have mostly evaporated at four weeks. This is the cheapest item on the list and the one most often skipped.
Failure modes
- Modelling the hike but not the path. One quarter point is noise. The projections describing another one, with no cuts until 2028, is the planning assumption. Model the path, not the headline.
- Treating fixed-rate debt as safe. It is safe until it matures. Fixed debt maturing inside eighteen months is floating debt with a delay.
- Hedging an exposure you have not sized. Swaps and caps are sold hard in tightening cycles. Do not buy one before Step 3 tells you the exposure is material; a hedge on 0.1% of revenue is a fee with a story attached.
- Cutting the wrong costs. Interest expense is a financing line. Cutting marketing to pay for it converts a financing problem into a growth problem, and next year you will have both.
- Waiting for certainty. There will not be any. Two meetings remain this year and the committee has told you what it currently thinks, which is the most information you are ever going to get in advance.
The ninety-minute checklist
- Seven-column debt inventory, one row per facility. Floating share and renewal cliff calculated.
- Every covenant run forward on a combined downside. Break month written down.
- Interest increase across two hikes, expressed as a percentage of revenue.
- Runway in months, with MAC-clause availability counted separately.
- One unprompted call to your lender, with the numbers in front of you.
- Every renewal date in the calendar at minus 120 days.
Run it this week. The businesses that get hurt in a tightening cycle are almost never the ones with the most debt — they are the ones who found out what their debt cost them a quarter after everyone else did.